Homestead Extension of Florida's Turnpike

toll expressway from Miramar to Florida City · South Dade (corridor wide)

Built or opened
1973
Community
South Dade, corridor wide · corridor wide
Status as of 11 September 2026
open
Historical state
pre Andrew
Connections
6 edges, 6 distinct neighbours · betweenness 0.038 (rank 10 of 371) · moves and capital only 0.000 (rank 186)
Confidence
Medium · sources: [R20] (register) · source upgrade flagged

Construction starts in July 1971; the first 13 miles open on 1 May 1973 and the road is continuous from Miramar to Homestead by 20 May 1974, with the final section to US 1 in Florida City later in 1974. The roughly 48 mile toll road has South Dade exits at Campbell Drive, Biscayne Drive and Speedway Boulevard and converted to all electronic tolling in 2011.

Detail: about 48 miles