Transit and roads · project
Krome Avenue Truck Bypass
truck route around downtown Homestead · Homestead
- Filed, approved or opened
- 2020 to 2021
- Community
- Homestead · municipality
- Status as of 11 September 2026
- delivered
- Historical state
- post Andrew
- Connections
- 5 edges, 5 distinct neighbours · betweenness 0.010 (rank 45 of 371) · moves and capital only 0.001 (rank 11)
- Confidence
- High · sources: [R24], [R25] (register)
Studied from 2014 to keep trucks out of the Homestead historic downtown, the FDOT bypass widens Campbell Drive (SW 312th Street), Davis Parkway (SW 336th Street) and Palm Drive (SW 344th Street) between Krome Avenue and US 1 to two lanes each way. Construction runs from March 2020 to 30 March 2021.
Detail: 2014 estimate $53.2 million
Connections
Moves, founders, developers
- developed byFlorida Department of Transportation District SixFDOT project 405575, completed 30 March 20212020 to 2021
- developedSW 312th Street Campbell DriveCampbell Drive widened as part of the bypass2020 to 2021
- developedSW 344th Street Palm DrivePalm Drive widened between Krome Avenue and US 12020 to 2021
Anchors, connections, hosting
- connectsKrome Avenue (SR 997)Bypass diverts trucks from Krome Avenue to US 1 via Campbell Drive2021 to present
Influence
- shapedDowntown HomesteadPurpose is to remove trucks from the Homestead historic downtown, Miami Today2014 to 2021
Located
- located inHomesteadSits in Homestead by address or centroid2020