Transit and roads · project

Krome Avenue Truck Bypass

truck route around downtown Homestead · Homestead

Filed, approved or opened
2020 to 2021
Community
Homestead · municipality
Status as of 11 September 2026
delivered
Historical state
post Andrew
Connections
5 edges, 5 distinct neighbours · betweenness 0.010 (rank 45 of 371) · moves and capital only 0.001 (rank 11)
Confidence
High · sources: [R24], [R25] (register)

Studied from 2014 to keep trucks out of the Homestead historic downtown, the FDOT bypass widens Campbell Drive (SW 312th Street), Davis Parkway (SW 336th Street) and Palm Drive (SW 344th Street) between Krome Avenue and US 1 to two lanes each way. Construction runs from March 2020 to 30 March 2021.

Detail: 2014 estimate $53.2 million

Connections

Moves, founders, developers

Anchors, connections, hosting

  • connectsKrome Avenue (SR 997)Bypass diverts trucks from Krome Avenue to US 1 via Campbell Drive2021 to present

Influence

  • shapedDowntown HomesteadPurpose is to remove trucks from the Homestead historic downtown, Miami Today2014 to 2021

Located

  • located inHomesteadSits in Homestead by address or centroid2020