South Dade Network MapStreet Economics® · network and lineage map · 1836 to 2026
Transit and roads · program

Metro Express (Routes 601 and 602)

all electric bus rapid transit service · South Dade (corridor wide)

Started
2025
Community
South Dade, corridor wide · corridor wide
Status as of 11 September 2026
operating
Historical state
post Andrew
Connections
2 edges, 2 distinct neighbours · betweenness 0.000 (rank 127 of 371) · moves and capital only 0.000 (rank 154)
Confidence
High · sources: [R5], [R3], [R1], [R41] (register)

Metro Express launches on 27 October 2025 after a ribbon cutting on 22 October 2025. Route 601 stops only at the BRT stations between Dadeland South and the SW 344th Street terminal, every 7.5 minutes in the peak direction and every 15 minutes off peak, while route 602 TransitWay Local makes all stops 24 hours a day. The county describes the fleet of New Flyer XE60 articulated electric buses as the longest all electric BRT service in the nation.

Detail: November 2025 weekday ridership reported as 5,469 on 601 and 4,064 on 602, Wikipedia

Connections

Lineage

Anchors, connections, hosting

  • hostsSouth Dade TransitWayMetro Express routes 601 and 602 run on the TransitWay from 27 October 20252025 to present

Located