SW 168 Street Park and Ride Garage

multi level transit parking garage · West Perrine

Filed, approved or opened
2024
Community
West Perrine · census designated place
Status as of 11 September 2026
under construction
Historical state
post Andrew
Connections
2 edges, 2 distinct neighbours · betweenness 0.004 (rank 84 of 371) · moves and capital only 0.000 (rank 177)
Confidence
High · sources: [R3], [R4], [R7] (register)

A multi level garage of about 645 spaces at the SW 168th Street station with electric vehicle charging, bicycle storage, a kiss and ride area and a direct connection to the BRT platform. DTPW lists it as opening in 2026 or 2027; the county presentation of 2021 had targeted winter 2022.

Detail: year is the reported construction period; opening announced for 2026 to 2027

Connections

Moves, founders, developers

Anchors, connections, hosting

  • connectsSW 168 StGarage has a direct connection to the SW 168 St BRT station2026 to 2027

Located

  • located inWest PerrineSits in West Perrine by address or centroid2024