Agriculture and the Redland · plan
Urban Development Boundary
county growth boundary protecting farmland · South Dade (corridor wide)
- Adopted or issued
- 1975
- Community
- South Dade, corridor wide · corridor wide
- Status as of 11 September 2026
- active
- Historical state
- pre Andrew
- Connections
- 4 edges, 4 distinct neighbours · betweenness 0.001 (rank 118 of 371) · moves and capital only 0.000 (rank 217)
- Confidence
- High · sources: [A31], [A32], [A28], [A33], [G66], [G65] (register)
The Urban Development Boundary first appears on the 1975 land use map of the county's Comprehensive Development Master Plan and is formally incorporated in the CDMP in 1983. It limits urban development in the western and southern county and keeps most Redland farmland outside the line; in 2025 the Property Appraiser classes 48,867 acres of farmland outside the UDB and 3,684 acres inside it. Moving the line requires a supermajority of the county commission and the South Dade Logistics and Technology District vote in 2022 is the most contested recent case.
Connections
Lineage
- came out ofComprehensive Development Master PlanUDB drawn on the 1975 CDMP land use map1975
Plans, funding, partners
- planned byMiami-Dade CountyBoundary set in the county's Comprehensive Development Master Plan1975 to present
- plannedThe Redlandboundary limits urban development in the Redland farmland1983 to present
Influence
- shapedThe Redland48,867 acres of farmland lie outside the boundary in 20251975 to present
- shapedSouth Dade Logistics and Technology DistrictCommission moves the line for the district in 2022; a judge overturns it in 20242022 to 2024
- shaped byMiami-Dade Agricultural Land Use Trends and Outlook StudyStudy projects farmland needed to 2050 for the boundary debate2023